Sustainable design features were incorporated.

In 2012, a 45,000 square foot manufacturing and distribution center was built in Hanover, PA allowing the company to broaden its production capabilities and product lines. The building was constructed of precast concrete wall systems, utilizing the most modern building design available in the market place today. Sustainable design features were incorporated into the building’s architecture and the facility meets LEED certified credentials.